jClock
Data Detail Dosen
NIP 025200519
Nama Winda Nur Cahyo
Gelar Depan
Gelar Belakang S.T., M.T., Ph.D.
Fakultas TEKNOLOGI INDUSTRI
Program Studi Teknik Industri

Karya Ilmiah : {PIC Fakultas} Penelitian - Publikasi Jurnal

Karya Ilmiah : {PIC Fakultas} Penelitian - Prosiding / Pemakalah Forum Ilmiah

Karya Ilmiah : Prosiding Penelitian

No. Judul Nama Tahun
1 Proposing a More Efficient Maintenance Scheduling for an Overhaul Maintenance Project in Engineering Asset Management
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2019
2 Improving the performance of an assembly line to increase production capacity using value stream mapping: A study case
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2019
3 Derivation of Life Cycle Cost Model for Selecting Optimum Decisions in Engineering Asset Management
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2018
4 Using CLD to Represent the Relationships between Maintenance and Its Resource-Provisioning System in Asset Management System
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2017
5 A modelling approach for maintenance resources-provisioning policies in a wind farm maintenance system
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2017
6 Integrated Maintenance and Inventory Optimization Model for Offshore Assets
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2014
7 A Resources Provision Policy for Multi-unit Maintenance Program
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
  2. Khaled El-Akruti,
  3. Tieling Zhang,
  4. Richard Dwight,
2013
8 Analisa Biaya Bantuan Sosial Dan Kesehatan Karyawan Tetap Universitas Islam Indonesia Menggunakan Simulasi Monte Carlo
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2009
9 Implementasi Fuzzy Multicriteria Decision Making Untuk Menentukan Peringkat Calon Penerima Beasiswa
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2009
10 Simulation Methods For Improving Manufacturing System Performance Based On Optimum Downtime In Billet Steel Plant Krakatau Steel Industry
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2009
11 Maintenance system design on air jet loom (AJL) machine using reliability centered maintenance (RCM) method
  1. Danang Setiawan, S.T., M.T.
  2. Winda Nur Cahyo, S.T., M.T., Ph.D.
2019
12 Production Scheduling to Minimize Makespan using Sequencing Total Work (TWK) Method and Campbell Dudek Smith (CDS) Algorithm
  1. Danang Setiawan, S.T., M.T.
  2. Winda Nur Cahyo, S.T., M.T., Ph.D.
2019

Karya Ilmiah : Publikasi Ilmiah

No. Judul Nama Tahun
1 The Proposed Dashboard Model for Measuring Performance of Small-Medium Enterprises (SME)
  1. Dr. Taufiq Immawan, S.T., M.M.
  2. Winda Nur Cahyo, S.T., M.T., Ph.D.
2019
2 Managing Maintenance Resources for Better Asset Utilisation
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
  2. Khaled El-Akruti,
  3. Richard Dwight,
  4. Tieling Zhang,
2015
3 Simulasi Perawatan Pencegahan Mesin
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2007
4 Simulasi Perawatan Pencegahan Mesin
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2007

Karya Ilmiah : Buku

No. Judul Nama Tahun
1 Life Cycle Cost Model to Support Asset Management Decision Making
  1. Winda Nur Cahyo, S.T., M.T., Ph.D.
2019

Sistem Informasi Manajemen Karya Ilmiah
Badan Pengembangan Akademik Universitas Islam Indonesia
Gedung Prabuningrat Lantai 3 Sayap Utara Jl. Kaliurang Km. 14,5 Yogyakarta
Telp: +62 274 898444 Fax: +62 274 898459
Copyright @April 2012 SIM Karya Ilmiah Universitas Islam Indonesia