| No. |
Judul |
Nama |
Tahun |
| 1 |
Risk Analysis of Supply Chain Cultivation of JOPER |
- Dr. Taufiq Immawan, S.T., M.M.
|
2019 |
| 2 |
Business Process Re-engineering in a Sugar Mill Manufacture: The Preliminary Study for Designing a Portable Machine |
- Dr. Taufiq Immawan, S.T., M.M.
|
2018 |
| 3 |
Business Process Re-engineering in a Sago Production Process |
- Dr. Taufiq Immawan, S.T., M.M.
|
2018 |
| 4 |
Design and Construction of Sago Rasper (As Business Process Re-Engineering of Sago Flour) |
- Dr. Taufiq Immawan, S.T., M.M.
|
2018 |
| 5 |
House of Risk Approach for Assessing Supply Chain Risk Management Strategies: A Case Study in Crumb Rubber Company |
- Dr. Taufiq Immawan, S.T., M.M.
|
2017 |
| 6 |
Analysis Line Balance Sound Board Glue Production On Assembly Grand Piano Process Case Study PT Yamaha Indonesia |
- Dr. Taufiq Immawan, S.T., M.M.
|
2016 |
| 7 |
Analysis of line balance sound board glue production on assembly grand piano process:case study PT Yamaha Indonesia |
- Dr. Taufiq Immawan, S.T., M.M.
- Riyanto Kurniawan,
|
2016 |
| 8 |
Peningkatan Pelayanan Permintaan Berdasarkan Analisis Inventori Dalam Mengatasi Late Delivery |
- Dr. Taufiq Immawan, S.T., M.M.
|
2007 |