No. |
Judul |
Nama |
Tahun |
1561 |
Integration of Servqual, Kano Model, and QFD to Design Improvement on .... |
- Agus Mansur, S.T., M.Eng.Sc.,
- Winda Nur Cahyo, S.T., M.T., Ph.D.,
|
2019 |
1562 |
Improving the performance of an assembly line to increase production capacity using value stream mapping: A study case |
- Winda Nur Cahyo, S.T., M.T., Ph.D.,
|
2019 |
1563 |
Production Scheduling to Minimize Makespan using Sequencing Total Work (TWK) Method and Campbell Dudek Smith (CDS) Algorithm |
- Winda Nur Cahyo, S.T., M.T., Ph.D.,
|
2019 |
1564 |
Business Process Re-engineering in a Sugar Mill Manufacture: The Preliminary Study for... |
- Dr. Taufiq Immawan, S.T., M.M,
- Winda Nur Cahyo, S.T., M.T., Ph.D,
|
2019 |
1565 |
The proposed dashboard model for measuring performance of Small-Medium Enterprises SME |
- Dr. Taufiq Immawan, S.T., M.M,
- Winda Nur Cahyo, S.T., M.T., Ph.D.,
|
2019 |
1566 |
Data-based maintenance strategy analysis using operational excellence approach in engineering asset management |
- Winda Nur Cahyo, S.T., M.T., Ph.D.,
- Dr. Taufiq Immawan, S.T., M.M,
|
2019 |
1567 |
Lean Concept Development in Fast Food Industry Using Integration of Six Sigma and TRIZ Method |
- Sri Indrawati, S.T., M.Eng.,
- Abdullah 'Azzam, S.T., M.T.,
- Suci Miranda, S.T., M.S,
- Atyanti Dyah Prabaswari, S.T., M.Sc.,
|
2019 |
1568 |
Research on a Project Schedule of Factory Renovation for Manufacturing Plants in Bandung |
- Suci Miranda, S.T., M.Sc.,
|
2019 |
1569 |
Improvement of storage system upright piano cabinet using class based storage |
- Qurtubi, S.T., M.T.,
- Suci Miranda, S.T., M.Sc.,
|
2019 |
1570 |
Information system design using labor productivity measurement for ... |
- Suci Miranda, S.T., M.Sc.,
- Vembri Noor Helia, S.T., M.T,
|
2019 |
1571 |
DEMAND FOR INDONESIAN COCOA BEANS IN A DILEMMA: CASE STUDY MALAYSIAN MARKET |
- Awan Setya Dewanta, Drs. ,M.Ec.Dev.,
|
2019 |
1572 |
Utilizing project management software in project scheduling: A case study |
- Suci Miranda, S.T., M.Sc.,
- Muchamad Sugarindra, S.T., M.T.I.,
|
2019 |
1573 |
COMPETITIVENESS ANALYSES OF INDONESIAN AND MALAYSIAN PALM OIL EXPORTS |
- Tri Nugraha Ramadhani,
- Rokhedi Priyo Santoso, SE., MIDEc,
|
2019 |
1574 |
Analysis of the influence of 5S work implementation culture on |
- Abdullah 'Azzam, S.T., M.,
- Sri Indrawati, S.T., M.Eng.,
|
2019 |
1575 |
TECHNOLOGY OF MINI PILES FOR HIGH EMBANKMENT STABILITY ON SOFT SOILS TO PREVENT A SETTLEMENT |
- Dr.Ir. Edy Purwanto,CES,DEA,
|
2019 |
1576 |
Supplier Selection Model Based on Risk in an Indonesian Healthcare Service Industry |
- Sri Indrawati, S.T., M.Eng.,
- Abdullah 'Azzam, S.T., M.T.,
|
2019 |
1577 |
THE EFFECT OF USING HARD LANDSCAPE MATERIAL ON THERMAL ENVIRONMENT (A CASE STUDY ON MALIOBORO STREET) |
- Ir. Supriyanta, M.Si.
|
2019 |
1578 |
Manufacturing Efficiency Improvement Through Lean Manufacturing Approach |
- Sri Indrawati, S.T., M.Eng.,
- Abdullah 'Azzam, S.T., M.T.,
|
2019 |
1579 |
The Character of Nighttime Architecture on Letjen Soeprapto Street at Semarang Old Town |
- ARIADI SUSANTO, S.T., M.T.
|
2019 |
1580 |
Indentification of Potential Tourism Activities In Traditional Houses and Open Space Around The Gnetala Arasy Tower Jambi |
- Hesti Rahmah Dini,
- Ir. Rini Darmawati, MT,
|
2019 |